The objective
A new line, greater throughput, improved quality, easier cleaning or equipment modernisation: what result do you want to achieve?
Resources / Preparing your project
A new machine, a treatment system or an installation to upgrade: here is the information that helps us develop your project together, whichever Tiko Innov solution you are considering.
01 / Your requirements
You do not need every answer from the start. Share what you already know; we can work through the rest together.
A new line, greater throughput, improved quality, easier cleaning or equipment modernisation: what result do you want to achieve?
Beverage, water or cleaning solution: describe its nature, temperatures, particular characteristics and planned product changes. Any available analyses are useful.
Specify flow in L/h, batch volumes, operating ranges and production hours. Distinguish normal demand from peaks and future requirements.
New or existing installation, site, schedule, shutdown windows and indicative budget if known: these details help establish a realistic scope.
02 / Your solution
Open the sections that apply to you. A project may combine several equipment families.
Sizing depends on the circuits to be cleaned, not just the capacity of the CIP tanks.
The product and its filterability guide the choice of media and configuration.
Start with the incoming water and intended use to identify suitable treatment stages.
The target gas content is defined alongside beverage and line conditions.
Thermal treatment must suit the product and the required result.
Defining functions and interfaces avoids treating each machine as an isolated unit.
Work on an existing installation starts by identifying the equipment and understanding its condition.
03 / Integration
Dimensioned layout in mm, doorways, available height, handling access and clearances for opening, cleaning and maintaining equipment.
Electricity, water, compressed air, steam, cooling, CO₂ and drainage as required by the process. Provide available capacities, pressures, temperatures and known connections.
Batch organisation, cleaning, consumables, maintenance access and team skills. Hygiene requirements and materials are defined for your application.
Define supply boundaries, upstream and downstream exchanges, required documents and test criteria. Performance is validated under agreed conditions.
04 / The first discussion
Gather what you already have. The project worksheet helps prepare your message; it does not replace the technical study.
No field is mandatory. We will clarify unknown parameters together. Avoid confidential information in this first enquiry.